Videos
Watch SORYQEX energy storage videos covering product demos, factory and customer visits, installation scenes, and real project applications.
Home Battery Installation
Installing a home energy storage battery for residential backup.
Solar Battery Charging & Discharging
Solar charging and evening discharge for home self-consumption.
All-in-One ESS Installation
Integrated home battery energy storage system installation.
Expansion Battery Connection
Connecting expansion battery capacity to a compatible system.
Home Backup Test
Home backup runtime demonstration under household loads.
Pack Assembly
Module and pack assembly on the production floor.
Battery Testing
Charge, discharge, and load checks during production.
System Assembly
Finished battery system assembly and line operation.
Aging & Expansion Check
Aging and module checks before outgoing inspection.
Final Test & Release
Final running test before packing and shipment.
Cabinet Production
Cabinet and commercial system production stages.
Product Overview
Front panel, connection area, communication ports, and the wall or floor layout of this pack.
Wall-Mounted Installation
The same pack fixed on a wall beside the inverter.
Floor-Standing Installation
The same pack placed on the floor, with power and communication cables to the inverter.
Inverter Connection
Battery cables and CAN, RS485, or RS232 wiring to a compatible hybrid inverter.
Parallel Connection
More than one unit wired to raise capacity. Confirm the inverter before paralleling.
Floor-Mounted Installation
The same pack placed on the floor when the wall is not suitable.
Product Overview Video
Cabinet layout, terminals, communication ports and floor-standing installation overview.
Parallel Expansion
Multiple units connected in parallel to increase total storage capacity.
Customer Installation Feedback
Installation position, inverter connection, cable routing and commissioning feedback.
Rack-Mounted Installation
19-inch rack mounting for utility rooms and small commercial energy storage sites.
Installation Video
High-voltage rack cabinet layout, DC terminals, communication ports and indoor rack installation overview for the 60kWh battery system.
PCS / Inverter Connection
Connection to a compatible high-voltage PCS or hybrid inverter through DC cables and CAN / RS485 communication.
System Expansion Check
Battery rack configuration, BMS compatibility and PCS capacity check before expanding a 60kWh high-voltage bank.