Commercial & Industrial ESS Cabinet
100kWh Battery
100kWh Battery for commercial backup, solar storage, peak shaving, and small industrial power projects.
Core Specification
| Core Specification | Value |
|---|---|
| Nominal Energy | 100kWh |
| Nominal Voltage | 358.4V DC |
| Battery Chemistry | LiFePO4 |
| Rated Capacity | 280Ah |
| Voltage Range | 280-408.8V DC |
| Max. Output Power | 50kW |
| Installation | Floor-standing Cabinet |
Choose a configuration
The integrated PCS cabinet combines battery storage, PV input and three-phase AC output; confirm grid, PV and backup requirements before quotation.
Key Specifications
| Specification | Details |
|---|---|
| Model | SORYQEX 100kWh C&I ESS Cabinet |
| Battery Configuration | 1P112S |
| Rated Capacity | 280Ah |
| Rated Energy | 100kWh |
| Battery Chemistry | LiFePO4 |
| Rated Voltage | 358.4V DC |
| Voltage Range | 280-408.8V DC |
| Rated Power | 50kW |
| Rated Charge / Discharge Current | 140A / 140A |
| Rated AC Output | 50kW |
| AC Voltage | 3L/N/PE 220/380V, 230/400V, 240/415V |
| Frequency | 50 / 60Hz |
| Max AC Current | 78A |
| Max PV Input Power | 96kW |
| Max DC Input Voltage | 1000V |
| MPPT Voltage Range | 150-850V |
| Cooling | Air Cooling |
| Fire Protection | Aerosol Fire Extinguishing |
| Detection | Temperature / Smoke / Water Leak |
| Protection Rating | IP54 |
| Dimensions | 1130 x 1000 x 1600mm |
| Weight | 1.4t |
| Certification | IEC62619 / EN62477-1 / IEC63056 |
Product Overview
About This C&I Storage Cabinet
- 100kWh
- 50kW
- LiFePO4
- IP54
- BESS
- C&I Cabinet
This cabinet-level C&I BESS is built for commercial sites. The key check is whether the cabinet matches your load list, site voltage, PV design, and backup target.
The SORYQEX 100 kWh LiFePO4 ESS cabinet supports commercial backup, solar self-consumption, and peak-load support for shops, warehouses, cold rooms, offices, small factories, and commercial solar projects.
| System Point | Project Meaning |
|---|---|
| Battery side | 100 kWh LiFePO4 energy storage cabinet |
| Power side | 50kW rated AC output |
| Solar side | 96kW max PV input, 150-850V MPPT range |
| Site side | Three-phase commercial distribution |
| Safety side | Fire extinguishing with temperature, smoke, and water leak detection |
Appliance Compatibility
Size the system from the critical load list, not from nameplate capacity alone.
| Load Type | Fit / Buyer Note |
|---|---|
| Office and building backup | Suitable - Lighting, network, security, computers |
| Retail and supermarket loads | Suitable - POS, lighting, selected refrigeration |
| Cold-room support | Conditional - Compressor startup must be checked |
| Pumps and motors | Conditional - Needs startup-current review |
| Commercial HVAC | Conditional - Do not size by capacity alone |
| CNC / production equipment | Conditional - Check PCS output and load priority |
| Whole-factory backup | Not direct fit - Needs load separation and engineering review |
During backup planning, separate critical loads from non-critical loads. The 50kW rated output is the main continuous-load boundary.
Inverter & Solar Compatibility
Match this C&I cabinet to the site's three-phase voltage, PV array, and backup mode before quotation. The PCS is built in, so solar input and AC output are checked as one system.
| Compatibility Item | Required Match |
|---|---|
| AC grid voltage | 220/380V, 230/400V, or 240/415V three-phase |
| PV input | Up to 1000V DC, MPPT 150-850V, 96kW max |
| Rated AC output | 50kW continuous |
| Battery voltage | 280-408.8V DC, 358.4V nominal |
| Operating mode | Grid-tied, off-grid, or backup |
| External inverter | Not required. PCS is inside the cabinet |
This is a high-voltage cabinet, not a 48V home battery. Do not pair it with a low-voltage hybrid inverter. Before ordering, confirm PV string voltage, three-phase grid voltage, and whether the project is grid-tied, off-grid, or backup-only.
Can It Be Installed and Expanded?
IP54 cabinet for commercial energy storage projects
Installation and protection parameters for this model.
| Feature | Details |
|---|---|
| IP Rating | IP54 |
| Rated Voltage | 358.4V DC |
| Operating Voltage | 280–408.8V DC |
| Drainage / Installation | Ground-mounted outdoor cabinet |
| Fire Protection | Aerosol fire extinguishing |
Before installation, check forklift access, floor loading, cabinet clearance, cable routing, ventilation, service space, and distance to the main distribution panel.
Product and Installation Videos
FAQ
What affects project pricing for a 100kWh Battery?
Final price depends on cabinet configuration, PCS / inverter setup, PV input design, fire protection, shipping, installation scope, grid connection requirements, and backup output design.
What drives pack and cabinet cost?
Cost is affected by battery chemistry, cabinet structure, safety system, cooling, certification, communication setup, and whether the project needs integrated solar charging or backup switching.
Is a 100 kWh solar storage cabinet suitable for commercial projects?
Yes, when PV input, AC output, site voltage, and backup loads are matched correctly for the commercial solar design.
How long will backup last?
Runtime depends on the actual load list. A site running 20kW critical loads lasts much longer than a site running 50kW continuous loads, so backup time should be confirmed from the customer's load schedule.
What should buyers provide before quotation?
Send the load list, site voltage, PV system size, backup target, installation location, grid connection type, and whether the project needs critical-load backup, peak shaving, or solar self-consumption.