Custom Capacity & Voltage
Use custom capacity & voltage to match your inverter platform, target market, and energy storage project.
02 · Intake
What We Need to Check
Send these points first so engineering can confirm platform match and inverter fit.
Get Engineering Review-
01
Load Power
Real power demand from the connected loads.
-
02
Backup Time
Required runtime for the selected capacity.
-
03
Inverter Model
Brand, model, operating range, CAN / RS485, and BMS setting.
-
04
Voltage Range
Low-voltage or high-voltage system direction.
-
05
Communication Protocol
CAN / RS485 match before sample confirmation.
-
06
Installation Method
Wall, floor, rack, stackable, or cabinet layout.
-
07
Expansion Need
Future capacity increase before system design.
03 · Process
Sample & Engineering Confirmation
From spec review to mass production approval, each step locks the custom capacity & voltage plan.
-
Spec Review
Confirm target capacity, platform, load power, backup time, inverter model, and application.
-
Inverter Match
Check inverter model, operating range, CAN / RS485, and communication protocol.
-
BMS Setting
Set protection logic, charge limit, discharge limit, and inverter communication.
-
Sample Test
Check appearance, wiring, label, function, and inverter connection.
-
Charge / Discharge Test
Test charging, discharging, protection response, and operating status.
-
Approval Before Mass Production
Approve the sample and test result before mass production.
Start Capacity Customization
Contact Me05 · Answers
FAQ
Can I customize capacity for my product line?
Yes. Send target capacity, application, inverter model, load power, backup time, and quantity.
Can you make 48V or 51.2V products?
Yes. 48V requests must match the 51.2V platform, inverter range, and communication protocol.
Should I choose low-voltage or high-voltage platforms?
Use LV packs for 51.2V home storage. Use HV systems for larger backup and commercial storage.
Can the pack match my inverter model?
Yes, if the inverter model, operating range, CAN / RS485, communication protocol, and BMS setting match.
What do you need to check backup time?
We need load power, backup time, target capacity, inverter model, platform, and application.
Can the system be expanded later?
Yes, if the platform, BMS setting, communication protocol, installation space, and system layout support expansion.
Can I approve a sample before mass production?
Yes. Sample test, inverter match, charge / discharge test, and approval before mass production come first.
Can you adjust BMS setting and communication protocol?
Yes. BMS setting can cover protection logic, CAN / RS485, charge limit, discharge limit, and inverter communication.