Industrial Projects
View industrial battery storage projects for factory backup, peak shaving, production load protection, and industrial solar storage.
Factory Project Cases
Each case shows the project location and result, then lets you start a similar industrial project.
100kWh Industrial Battery Project
View Similar Project
215kWh Outdoor Energy Storage Cabinet Project
View Similar Project
500kWh Battery Energy Storage Project
View Similar Project
1MWh Containerized BESS Project
View Similar ProjectInstallation & Test Videos
Watch outdoor cabinet installation, PCS connection, EMS monitoring, and factory load tests.
-
01
Outdoor Energy Storage Cabinet Installation
Cabinet placement, foundation, cable entry, and access space.
-
02
PCS Connection
PCS, battery cabinet, grid side, and factory distribution wiring.
-
03
EMS Monitoring
Power flow, battery status, load control, and operating data.
-
04
Three-Phase Connection
Three-phase connection checked before factory load matching.
-
05
Load Test
PLC backup, pump backup, compressor backup, factory lighting backup, and control cabinet backup.
-
06
Peak Shaving Project
Peak shaving performance during high-demand periods.
-
07
Industrial Solar Storage Project
Solar input, battery charging, PCS control, and site operation.
Start a Similar Industrial Project
Send factory load data and site conditions. Engineering matches the closest industrial battery storage project size before quoting.
-
01
Load Power Send load list, rated power, startup current, and critical equipment.
-
02
Three-Phase System Send factory voltage, three-phase system details, and cabinet condition.
-
03
Backup Time Tell us which loads must stay on and for how long.
-
04
Site Conditions Send site photos, installation space, solar capacity, and peak shaving target.
-
05
Project Review Engineering checks the right industrial battery storage project size before quoting.
FAQ
Can you build a project similar to these cases?
Yes. Send load power, three-phase system, backup time, and site conditions first.
How do I choose 50kWh, 100kWh, 215kWh, 500kWh, or 1MWh?
Choose by factory loads, backup time, peak shaving target, solar capacity, and expansion plan.
Can these projects support PLCs, pumps, and compressors?
Yes, but pumps and compressors must be checked by startup current and PCS capacity.
Can the system connect to three-phase factory power?
Yes, after voltage, PCS, protection, and distribution cabinet conditions are confirmed.
Can the cabinet be installed outdoors?
Yes, after spacing, ventilation, foundation, cable path, and maintenance access are checked.
Can it be used for peak shaving?
Yes, when load curve, peak demand, PCS power, and EMS strategy match the project.
What information do you need before quoting?
Load list, rated power, startup current, backup time, three-phase voltage, site photos, solar capacity, and installation space.